Friday, 24 June 2011

Sentinel 7109's Boiler ready for cladding

Final preparation of the boiler has been completed at Mendip Steam Restorations so that the cladding can be added to hold in the ceramic insulating material.
'Lip' Highlighted
Around the lower edge of the wide upper section is a 'lip' which both supports the lagging and enables the cladding sheets to be attached with pop-rivets. This is how it was done previously however many of the remains of the rivets were still blocking the holes. These needed to be drilled out in preparation to fit the new rivets and cladding.
Drilling for drainage
Water had been prone to collecting in the 'lip' and promoting rust and required some holes to be drilled in the lip to improve drainage.

I enjoy visiting Mendip Steam Restorations as there is always something interesting happening and a friendly welcome (possibly influenced by the packet of chocolate digestives I took along!). Currently, three traction engine boilers are being worked on as shown. I hope to do an extensive article on MSR in the future.
MSR (1)
MSR (2)
MSR (3)
Until work began on Sentinel 7109, I'd been completely unaware that this type of industry still existed in the UK; however, I really am pleased to find that it does and what a wonderful and skilful bunch of guys these people are!

Monday, 20 June 2011

A special welcome...


... to arrivals from VegPlotting.

(NSW, Non-Steam Wife) has clearly been generating a lot of traffic to Sentinel 7109. So here's a little posting especially for you!
2011 Greenhouse at Midsomer Norton Station
Sentinel 7109 lives at Midsomer Norton Station, near Radstock, Somerset, UK (BA3 2EY). This particular station was always characterised by its greenhouse which was situated next to the signal box. Station staff used it to cultivate all sorts of produce (which, in those more gentle 1950's days, there was time to do between trains).
1959 (Photo: Eric Rimmer (SDRT Collection)
from Alan Hammond's Heart of the Somerset & Dorset Railway)
The line was closed in 1966 and most of the station including the greenhouse was dismantled. In September 2003, the scene looked as in the picture below.
September 2003 wasteland
In 2005, work began to bring the signal box and greenhouse back to life.
October 2005
June 2006
January 2007 (with Graeme Mayes perched on the roof)
May 2007 (My name is on one of the roof-tiles as are many others
who sponsored the tiles at a pound a time)
June 2008 externally complete but no greenhouse
Magically stepping forward to 2011, the greenhouse is complete to accompany the signal box. Produce is being grown again and sold to raise funds for the project as a whole. So Garden Bloggers and all, do come and visit us at Midsomer Norton Station any Sunday and enjoy all the sights and sounds (and cake) that are on offer.
May 2011 Greenhouse and Signal box complete in all their glory

Sunday, 19 June 2011

Sentinel 7109's Mechanical Lubricator



Sentinel 7109 uses a four-barrelled Delvac mechanical lubricator made by the "Vacuum Oil Company Ltd".
Delvac Mechanical Lubricator before cleaning
It is driven from a crank on the front engine drive shaft. A camshaft in the lubricator housing is then rotated slowly by the rocking action on a ratchet arm; via rockers, the cams gently push on each of the four barrel pumps on each rotation of the camshaft.
There's a camshaft and four rockers somewhere in the sludge...
...right there in fact!
Rocker springs and cam-followers...
...and the pump barrels
Three of the four pumps have a wire in them which sits in the pump nozzle. I can't see what it is for; a flow restrictor maybe but the wire is too flimsy to make any difference. I'd be glad to hear from anyone who knows better!
Wire lodged in the pump outlet...
...and extending down in to the pump nozzle
The mechanical lubricator has been cleaned, repaired and filled; cylinder oil now exudes from all the right orifices.

Delvac Mechanical Lubricator after cleaning

Thursday, 16 June 2011

Sentinel 7109's Superheater - Good News

A preliminary hydraulic test has been done on the boiler's four-tube superheater and no problems have been found.
Four-tube superheater awaiting attention
Justin Goold commented after the test that the superheater seemed to be new-old stock and that it did not appear to have ever been used. This is, of course, really good news as there far less chance of an early failure (I hope I'm not tempting providence here!).

Superheaters have to be certified as passing an even more demanding test than the boiler itself. The boiler requires a 1.5 times working pressure test (412.5 psi) whereas the superheater needs to withstand 2 times working pressure (550 psi). These figures reflect the fact that Sentinels had about the highest working pressure of any steam loco on British Railways.


There is yet the boiler inspector's formal test by Peter Hawkins for certification before the superheater can be installed in the boiler (and one or two (hundred) other things in the meantime!). It's all progress!

Wednesday, 15 June 2011

Sentinel 7109's regulator and operating valve assembly

When Sentinel 7109 arrived at Midsomer Norton Station in December 2004, it was in a pretty rough and partly disassembled condition. The regulator assembly was covered in rust from a few decades of atmospheric exposure.
Regulator Assembly on arrival(1)
Regulator Assembly on arrival(2)
The regulator valve internals were unserviceable.
Original inside surface of regulator valve...
...with valve segment in place
The stop valve was unlikely to stop anything!

Stop valve pitted with rust...
...deeply pitted that is!
But in the right hands, things come back to life.
The refurbished regulator valve...
...and a stop valve which will stop something...
...and all the rest of the bits and pieces!
The whole regulator and operating valve assembly has been completely refurbished superbly by John Goold of J R Goold Vintage Steam Restorations Ltd in Camerton.
Refurbished valves
Related Posts Plugin for WordPress, Blogger...