Tuesday, 14 June 2011

Sentinel 7109's Cab-Mounted Boiler Feed Pump (BFP)

(If you want to skip to the video, click here). 

A replacement twin-cylinder Worthington-Simpson boiler feed pump was purchased from Richard Vincent of Vincent Engineering at Henstridge Airfield, Templecombe, Somerset. 
WS Boiler Feed Pump as found
It had clearly been lying about for a while and was "in need of some attention". (The word "some" is used loosely here!).
Steam cylinders as found
Slide valves as found
Water pump valves as found
The WS boiler feed pump is a steam engine in its own right. Steam and water cylinders have had to be carefully scraped clean, the outside cleaned and painted plus a lot more. 
BFP - looking like new again!
Maker's plate showing a 50 in the serial number
to indicate the 1950 date of manufacture

Like the main engines, the pump will chug away merrily on compressed air when asked to, albeit without any water to pump as yet. (Note: Adobe Flash player will be needed to run the video (indicated by a blank image above).
Water pump piston rings(1) 
Water pump piston rings(2)
Prior to testing as a water pump, I'd expected the pump to be able to suck or blow air; however, this is not the case and air can merrily be blown through it either way with no effort at all. Something is clearly amiss!
Cut-away drawing of 3x2x3 WS Pump
Each water pump piston has four rings of a cloth reinforced material as in the pictures. Each ring has a split so I'm expecting them to expand to a good fit when pressurised by pumping water - well let's hope so anyway.
BFP Displacement Lubricator
A displacement lubricator has been obtained from Richard Nixon of the Sentinel Drivers' Club (not the original tricky one) and has been restored to ensure the pump will be able to work with its own steam oil supply. 

Monday, 13 June 2011

Sentinel 7109's General Progress

I’m often asked when Sentinel 7109 is likely to be back in steam. My standard answer is always “about a year” but never fall into the trap of stating when the year will actually begin! Oddly, lately, I’ve started to feel strangely as if the end of that year is drawing nearer. I’m sure the feeling will pass! 

There has been a lot of progress over the last six months; much of it off-site and not so obvious to visitors to Midsomer Norton station.


Have a click around the Categories for reports on the various areas of progress.



Only five postings are shown in the central column. To see other/older posts, click on "Older Posts" at the bottom of the central column.

Sentinel 7109's Boiler Cladding

The current broad target is to prepare the boiler for reinstatement in Sentinel 7109. It involves bringing many things together so the boiler does not have to be removed again just to fit something in behind!

Sunday 12th June was heavy rain all day so some indoor activity was in order and painting the cladding sheets was a priority activity anyway.
7109's Boiler in cab (photo Mike Morant)
Looking at an early photo of 7109's boiler in place, light grey was chosen as the colour.
Inside view of RH cladding plate
The boiler cladding sheets are in two halves for the left and right hand sides. These had previously been derusted and primed in red oxide (if only grey had been used !).
In Chippenham's KM Farm Parts, I discovered Vapormatic Massey Ferguson metallic grey which looks pretty good when applied with a roller.
Inside view of LH cladding plate
Top pieces of cladding
And whoever designed the workshop conditions should be shot! However, the 2 inch chains make an excellent non-slip surface when the floor is wet (due to the leaks in the roof!).

Sentinel 7109 - Bits Missing

When Sentinel 7109 arrived at Midsomer Norton Station in December 2004, not everything was present. It was missing the following items:

Although many items have been sourced, any offers of suitable replacements for the missing items will be welcomed with open arms!

Sentinel 7109's Boiler goes for repair

Courtesy of local company R J King, the boiler left the Midsomer Norton Station on 17th December 2010 for Mendip Steam Restoration Ltd in Stoke St Michael. Richard Philips has done a superb job replacing six tubes, sand-blasting, painting, rejointing, restudding, reassembly and more.
Boiler leaving the station on 17th Dec 2010...
...and arriving at Mendip Steam Restoration later the same day
About 420 psi hydraulic pressure showing
The result was a first hydraulic test certificate issued on 13th April by our boiler-inspector, Peter Hawkins, to say that it had satisfactorily with-stood a pressure of 412.5 psi for half an hour. (This is the first hydraulic test at 1.5 times normal working pressure to prove the workmanship and strength of the structure).