The vertical boiler has four fixing brackets at the front, rear, left and right sides. Starting with the rear, the sides and finally the front, access becomes steadily more tortuous!
Rear bracket with the boiler-maker's plate above |
Having aggressively wire-brush-cleaned the bolts and holes well and applied graphite grease, I found I was facing an interference or at least very tight fit - the sort that works better, the bigger the hammer!
When there isn't much space to work in, swinging a big hammer is an art form to behold - one that Norman had mastered a long time ago but has so far eluded me! Still, when you have a master of an art, why not make the best use of him! So I did and thanks to Norman and my spanner wielding self, the boiler is now very firmly bolted down.
Left hand bracket |
Right hand bracket |
The pipe can be seen in the cab doorway. Photo courtesy of the Sentinel Drivers' Club but heavily doctored for the cab detail |
Front bracket from above - not too accessible! |
Front bracket from below (somewhere near the rear axle!) |
Front bracket from below - with the rear axle showing |
The Front fixing in grey is just above the axle - much easier to get at without a boiler in the way! |
No comments:
Post a Comment